Contract between IMM and SONELGAZ for the acquisition of equipment and materials as well as setting generators service for the construction and / or expansion of diesel power plants in Algeria.


The assignment is a full EPC mission, including engineering, procurement, transportation, civil works, erection, commissioning, training,and on site technical assistance for all associated equipment.
•          Lot 1: 4 generation units equipped with DEUTZ diesel in  M'Guiden
•          Lot 2: 7 generation units equipped with 2 MW ABC generator packages in Beni Abbes sites, Bordj Badji Mokhtar, Djanet and El Golea
•          Lot 3: 6 generation units equipped with 4 MW CATERPILLAR diesel generators in Tindouf


Contract amount::   80 Mios €

Contractual schedule: 12 months


2008-2010-algerie_f_7_289_0
2008-2010-algerie_f_8_289_0
2008-2010-algerie_f_6_289_0
2008-2010-algerie_f_4_289_0
alg2010_1
alg2010_2

Related Projects

Check our latest portfolio projects. Sure you'll find something interesting.